Fettes College required additional study rooms for non-boarding sixth formers. The rooms are designed to provide high quality study space for 4 pupils in each pod. The pods are accessed by a wide access deck with stair cases on either end.

Ecosystems were appointed in April 2021 and worked with Fettes College’s masterplan architects Page Park to finalise the planning and building warrant applications. Planning was secured mid July and the study rooms were delivered to site on 27th August, 6 weeks later.

The site was highly constrained with the existing Craigleith sixth form boarding house on one side and mature, protected trees on the other. To add to the complexity, the small site has mutiple services running through it, many of which were uncharted. Foundation excavations also revealed a historic crane base which had not been recorded in the site investigation report.
Ecosystems Technologies was the main contractor for this project and employed a ground-worker and separate piling contractor to install the sub-structure whilst the pods were being manufactured in our factory in Invergordon. The pods were transported to the site in convoy.