Scottish Power is to reaching their net zero carbon target by 2030. As such they commissioned Ecosystems to design, manufacture and install a 19m x 8m temporary jointing workshop in mass timber.
The building is designed to be fully demountable, to allow Scottish Power to move it as required to other sites when necessary. Using temporary jackpad foundations, the building is being delivered in 3 volumetric units and 2 units which are panelised.

The main structural component is a glued laminated timber portal frame. This setup allow long unobstructed spans within the building. This is particularly important when open space is an important feature.